INTERSTATE ROUTE H-1

ADDITION AND MODIFICATION OF FREEWAY ACCESS

(Kapolei Interchange Complex), Phase 3

Federal-Aid Project No. NH-H1-1(271)

Archive – 00H1-1029-D3C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 16

CATCH WATER BASIN (CWB) – NOTICE OF INTENT (NOI) FORM

 

 

1 - 6

NOI FORM C DOCUMENTS

1

SITE SPECIFIC BMPS PLAN ATTACHMENTS – ATTACHMENT A – PROJECT SITE MAPS AND CONSTRUCTION PLANS/DRAWINGS (SECTION C.8)

1

FIGURE 1 – LOCATION AND VICINITY MAP

1

FIGURE 2 – OUTFALL LOCCATION

1

FIGURE 3 – GENERAL PLAN

1

FIGURE 4 – EXISTING DRAINAGE MAP

1

FIGURE 5 – PROPOSED DRAINAGE MAP

1 - 3

FIGURE 6 – FLOW CALCULATIONS

1

FIGURE 7 – FLOOD INSURANCE RATE MAP (FIRM)

1 - 5

FIGURE 8 – EROSION CONTROL PLAN

1

FIGURE 9 – EROSION CONTROL DETAILS

1 - 8

FIGURE 10 – GRADING PERMIT DETERMINATION FOR CITY AND COUNTY OF HONOLULU PROJECTS

 

 

1 - 3

NOTICE OF GENERAL PERMIT COVERAGE (NGPC) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), KAPOLEI INTERCHANGE COMPLEX, PHASE 3 – FILE NO. HI R10G137_LETTER FROM DOH (DTD. JUNE 26, 2020)

 

 

1 - 53

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) DOCUMENTS FOR:  INTERSTATE ROUTE H-1, ADDITION AND MODIFICATION OF FREEWAY ACCESS (KAPOLEI INTERCHANGE COMPLEX), PHASE 3, FAP NO. NH-H1-1(271)

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS

1 - 9

SWPPP ATTACHMENT A-1, BMP MAPS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

OAHU ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

OAHU ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

OAHU ATTACHMENT E3 – HDOT HIGHWAY OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART; HDOT CONSTRUCTION DISCHARGE REPORT FORM

1 - 3

OAHU ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 4

OAHU ATTACHMENT E5 – RECEIVING STATE WATERS INSPECTION REPORT FOR INDIVIDUAL NPDES PERMITS

1 - 10

KAUAI/MAUI/HAWAII ATTACHMENT E1 – HDOT INSPECTION REPORT FOR KAUAI, MAUI AND BIG ISLAND

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS, DOCS OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN & OTHER INFO. AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1 - 2

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

 

 

1 - 39

GEOTECHNICAL ENGINEERING EXPLORATION AND PAVEMENT JUSTIFICATION REPORT FOR KAPOLEI INTERCHANGE COMPLEX, PHASE 3, W.O. 5537-50 (DTD. AUG. 17, 2015)

1

CLOSURE

1

PLATES (COVER)

1

PLATE 1 – PROJECT LOCATION MAP

1 - 2

PLATES 2.1 & 2.2 – SITE PLANS

1

PLATE 3 – TYPICAL SETTLEMENT GAUGE

1

PLATE 4 – TYPICAL EDGE DRAIN DETAILS

1 - 18

APPENDIX A – FIELD EXPLORATION

1 - 20

APPENDIX B – LABORATORY TESTS

1 - 4

APPENDIX C – FIELD INFILTRATION TESTS

1 - 8

APPENDIX D – PAVEMENT DESIGN