INTERSTATE ROUTE H-1

P.M. CONTRAFLOW LANE, PHASE 1 & 2

Vicinity of Radford Drive to Waiawa Interchange

Federal-Aid Project No. NH-H1-1(260)

Archive – 00H1-1043-P1D2

 

INDEX TO DRAWINGS – AS-BUILTS

SHEET NO.

DESCRIPTION

1

TITLE SHEET

2 - 3

DETAILED INDEX

4

STANDARD PLANS SUMMARY

5 - 9

GENERAL NOTES

10 - 12

GENERAL LAYOUT PLANS

13 - 26

TYPICAL ROADWAY SECTIONS

27 - 52

DEMOLITION PLANS

53 - 89

ROADWAY PLANS/DETAILED ROADWAY PLANS

90 - 94

RETAINING WALL PROFILE/RETAINING WALL/BARRIER DETAILS

95 - 115

GRADING PLANS

116 - 142

PAVEMENT MARKING AND STRIPING PLANS

143 - 144

SIGNING PLAN

145 - 150

SIGN DETAILS

151 - 188

EROSION CONTROL AND DRAINAGE PLANS/DETAILED EROSION CONTROL AND DRAINAGE PLANS

189 - 197

DRAINAGE/EROSION CONTROL DETAILS

198 - 209

GUARDRAIL/QUADGUARD DETAILS

210 - 242

TRAFFIC CONTROL PLANS AND DETAILS

243 - 605

STRUCTURAL PLANS