INTERSTATE ROUTE H-1 (EB) IMPROVEMENTS

Ola Lane Overpass to Likelike Highway Off-Ramp

Federal-Aid Project No. NH-H1-1(280)

Archive – 00H1-1018-D2C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 4

NOTICE OF GENERAL PERMIT COVERAGE (NGPC) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) INTERSTATE H-1 EASTBOUND IMPROVEMENTS, OLA LANE TO LIKELIKE HIGHWAY OFF-RAMP, FILE NO. H123FH077, LTR. DATED JAN. 26, 2023

1 - 3

NOTICE OF GENERAL PERMIT COVERAGE (NGPC) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) INTERSTATE H-1 EASTBOUND IMPROVEMENTS, OLA LANE TO LIKELIKE HIGHWAY OFF-RAMP, FILE NO. HIR10H076

 

 

1

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) COVER – INTERSTATE H1 (EB) IMPROVEMENTS OLA LANE OVERPASS TO LIKELIKE HIGHWAY OFF-RAMP

1 - 51

SWPPP DOCUMENTS

1

SWPPP ATTACHMENT A (COVER) – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 9

DISCHARGE MAP

1

FLOOD ZONE MAP

1

EXISTING DRAINAGE BASIN MAP

1

PROPOSED DRAINAGE BASIN MAP

1 - 4

EXISTING RATIONAL METHOD

1 - 4

PROPOSED RATIONAL METHOD

1 - 5

EROSION CONTROL

1 - 6

ROADWAY PAVING PLAN

1 - 8

CONSTRUCTION STAGING PLAN

1 - 34

WET UTILITIES

1 - 116

CITY AND COUNTY OF HONOLULU STORM WATER BEST MANAGEMENT PRACTICES MANUAL:  BMP DETAILS

1 - 190

HDOT CONSTRUCTION BEST MANAGEMENT PRACTICES FIELD MANUAL:  BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

OAHU ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

OAHU ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

OAHU ATTACHMENT E3 – HDOT HIGHWAY OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART; HDOT CONSTRUCTION DISCHARGE REPORT FORM

1 - 3

OAHU ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 4

OAHU ATTACHMENT E5 – RECEIVING STATE WATERS INSPECTION REPORT FOR INDIVIDUAL NPDES PERMITS

1 - 10

KAUAI/MAUI/HAWAII ATTACHMENT E1 – HDOT INSPECTION REPORT

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECIFICATIONS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCUMENTATION, DOCUMENTATION OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO. AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

 

 

1 - 3

GEOTECHNICAL ENGINEERING EXPLORATION REPORT – COVER AND GEOLABS LETTER DATED NOV. 21, 2022

1 - 3

GEOTECH TABLE OF CONTENTS

1 - 60

GEOTECH DOCUMENTS

1

PLATES (COVER)

1

PLATE 1 – PROJECT LOCATION MAP

1

PLATE 2 – OVERALL SITE PLAN

1 - 2

PLATES 3.1 AND 3.2 – SITE PLANS

1 - 4

PLATES 4.1 THRU 4.4 – GENERALIZED GEOLOGIC CROSS SECTIONS

1 - 46

APPENDIX A – FIELD EXPLORATION

1 - 12

APPENDIX B – SEISMIC SHEAR WAVE VELOCITY TESTS

1 - 69

APPENDIX C – LABORATORY TESTS

1 - 28

APPENDIX D – PHOTOGRAPHS OF CORE SAMPLES

1 - 15

APPENDIX E – EUROFINS ENVIRONMENT TESTING AMERICA ANALYTICAL REPORT