INTERSTATE ROUTE H-1

Guardrail and Shoulder Improvements

Kapiolani Interchange to Ainakoa Avenue

Federal-Aid Project No. IM-H1-1(244)R

Archive – 00H1-1017-D1C1R

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 2

GEOTECH ENGINEERING SOLUTION COVER FOR INTERSTATE ROUTE H-1 GUARDRAIL AND SHOULDER IMPROVEMENTS KAPIOLANI INTERCHANGE TO AINAKOA AVENUE, W.O. 6099-00, DATED JUY 22, 2016

1

GEOLABS LETTER DATED JULY 22, 2016, REF. W.O. 6099-00

1 - 2

TABLE OF CONTENTS

1 - 2

SUMMARY OF FINDINGS AND RECOMMENDATIONS

1 -2

SECTION 1. GENERAL

1 - 4

SECTION 2.  SITE CHARACTERIZATION

1 - 12

SECTION 3.  DISCUSSION AND RECOMMENDATIONS

1 - 2

SECTION 4.  LIMITATIONS

1

CLOSURE

1

PLATES COVER SHEET

1

PLATE 1 – PROJECT LOCATION MAP

1

PLATE 2 – GENERAL SITE PLAN

1 - 6

PLATES 3.1 THRU 3.6  - SITE PLANS

1

PLATE 4 – GEOLOGIC MAP

1

APPENDIX A COVER SHEET

1 - 2

APPENDIX A – FIELD EXPLORATION

1

PLATE A-0.1 – SOIL LOG LEGEND

1

PLATE A-0.2 – SOIL CLASSIFICATION LOG KEY

1

PLATE A-0.3 – ROCK LOG LEGEND

1 - 11

PLATE A-1 THRU A-11 – LOG OF BORING

1

APPENDIX B COVER SHEET

1

APPENDIX B – LABORATORY TESTS

1 - 4

PLATE B-1 THRU B-4 – LAB TESTS

1

APPENDIX C COVER SHEET

1

PLATE C-1 – PHOTOGRAPHS OF CORE SAMPLES

1 - 10

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT SYSTEM (NPDES), NOTICE OF INTENT FORM C (NOI FORM C) AND NOTICE OF GENERAL PERMIT COVERAGE (NGPC) FILE NO. HI R10F173

1

NOI FORM C – SITE SPECIFIC BMPS PLAN ATTACHMENTS – ATTACHMENT A – PROJECT SITE MAPS AND CONSTRUCTION PLANS/DRAWINGS

1

ATTACHMENT A-1 – FIGURES (COVER SHEET)

1 - 4

NOI FORM C - FIGURES

1

ATTACHMENT A-2 – STORM WATER RUNOFF CALCULATIONS (COVER SHEET)

1 - 21

NOI FORM C – STORM WATER CALCULATIONS

1

ATTACHMENT A-3 – CONSTRUCTION DRAWINGS (COVER SHEET)

1 - 9

NOI FORM C – CONSTRUCTION DRAWINGS

1

FIGURE 3 – ALTERNATE A – RESTRIPE AND MODIFY CENTER MEDIAN

1 - 13

CWB NOI FORM

1

STORMWATER POLLUTION PREVENTION PLAN (SWPPP) COVER SHEET

1

SWPPP TABLE OF CONTENTS

1 - 2

SECTION 1:  CONTACT INFORMATION/RESPONSIBLE PARTIES

1 - 5

SECTION 2:  SITE EVALUATION, ASSESSMENT, AND PLANNING

1 - 14

SECTION 3:  EROSION AND SEDIMENT CONTROLS AND BEST MANAGEMENT PRACTICES (BMPS)

1 - 2

SECTION 4:  SPILL PREVENTION AND RESPONSE

1 - 6

SECTION 5:  INSPECTION AND CORRECTIVE ACTION

1

SECTION 6:  TRAINING

1

SECTION 7:   CERTIFICATION AND NOTIFICATION

1

SWPPP APPENDICES

1

APPENDIX A – FIGURES AND DRAWINGS

1

APPENDIX A-1 FIGURES

1

SWPPP FIGURE 1

1

SWPPP FIGURE 2

1

SWPPP FIGURE 3

1

SWPPP FIGURE 4

1

APPENDIX A-2 DRAWINGS (COVER SHEET)

1 - 9

SWPPP DRAWINGS

1

SWPPP FIGURE 3 ALTERNATIVE A – RESTRIPE AND MODIFY CENTER MEDIAN

1 - 3

APPENDIX B – INSPECTION/CORRECTIVE FORM

1

APPENDIX C – SWPPP AMENDMENT LOG

1

APPENDIX D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1

APPENDIX E – GRADING AND STABILIZATION ACTIVITIES LOG

1

APPENDIX F – SWPPP TRAINING LOG

1

APPENDIX G - PERMITS

1 - 10

NPDES, NOI FORM C, NGPC

1 - 2

APPLICATION FOR COMMUNITY NOISE VARIANCE

1

TABLE OF CONTENTS

1

SECTION 1 – APPLICATION FOR COMMUNITY NOISE VARIANCE

1 - 3

APPLICANT INFORMATION

1

SECTION 2 – ADDITIONAL INFORMATION

1 - 9

ADDITIONAL INFORMATION FOR THE COMMUNITY NOISE VARIANCE APPLICATION

1

SECTION 3 – PUBLIC NOTIFICATION DOCUMENTATION

1 - 11

DRAFT PUBLIC NOTICE LETTER AND LIST OF ADDRESSES

1

SECTION 4 - DRAWINGS

1

FIGURE 1 – NOISE VARIANCE NOTIFICATION AREA

1

FIGURE 2 – NIGHTTIME CONSTRUCTION LOCATION

1 - 9

CONSTRUCTION DRAWINGS – SITE PLANS 1 THRU 9

1 - 15

NOISE VARIANCE

1 - 4

FINAL ARCHAEOLOGICAL MONITORING PLAN

1 - 2

TABLE OF CONTENTS

1 - 2

LIST OF FIGURES

1 - 15

SECTION 1 INTRODUCTION

1 - 41

SECTION 2 BACKGROUND RESEARCH

1 - 3

SECTION 3 ARCHAEOLOGICAL MONITORING PROVISIONS

1 - 9

SECTION 4 REFERENCES CITED

1 - 2

APPENDIX A SHPD 6E-8 HISTORIC PRESERVATION REVIEW LETTER