INTERSTATE ROUTE H-1

Guardrail and Shoulder Improvements

Middle Street to Punchbowl Off Ramp

Federal-Aid Project No. IM-H1-1(242)

Archive – 00H1-1016-D1C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 50

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR INTERSTATE ROUTE H-1 GUARDRAIL AND SHOULDER IMPROVEMENTS MIDDLE STREET TO PUNCHBOWL OFF-RAMP, FAP NO. IM-H1-1(242)

1

SWPPP ATTACHMENTS – ATTACHMENT A

CONTRACTOR/SUB-CONTRACTOR CONTROL, PROPERTY, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B - HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C - CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

SWPPP ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

SWPPP ATTACHMENT E2 – DISCHARGE REPORT FOR OAHU

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 5

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS, DOC OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, & OTHER INFO AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

1 - 65

SWPPP ATTACMENT A – 1 BMP MAPS AND DETAILS

1 - 2

SM-1 – EMPLOYEE TRAINING

1 - 2

SM-2 – MATERIAL DELIVERY AND STORAGE

1 - 2

SM-3 – MATERIAL USE

1

SM-4 – PROTECTION OF STOCKPILES

1 - 4

SM-5 – CONCRETE WASTE MANAGEMENT

1 - 2

SM-6 – SOLID WASTE MANAGEMENT

1 - 2

SM-7 – SANITARY/SEPTIC WASTE MANAGEMENT

1 - 2

SM-8 – CONTAMINATED SOIL MANAGEMENT

1 - 3

SM-9 – HAZARDOUS WASTE MANAGEMENT

1 - 2

SM-10 – SPILL PREVENTION AND CONTROL

1

SM-11 – VEHICLE AND EQUIPMENT CLEANING

1 - 2

SM-12 – VEHICLE AND EQUIPMENT MAINTENANCE

1 - 2

SM-13 – VEHICLE AND EQUIPMENT REFUELING

1

SM-14 - SCHEDULING

1 - 2

SM-16 – PRESERVATION OF EXISTING VEGETATION

1 - 2

SM-17 – DEWATERING OPERATIONS

1 - 2

SM-18 – DUST CONTROL

1 - 2

SM-19 – PAVING OPERATIONS

1 - 2

SM-20 – STRUCTURE CONSTRUCTION AND PAINTING

1 - 2

SM-21 – TOPSOIL MANAGEMENT

1

CHAPTER 2 – EROSION CONTROL

1 - 3

EC-2 – STABILIZED CONSTRUCTION ENTRANCE/EXIT

1 - 2

EC-5 – SEEDING AND PLANTING

1 - 6

EC-6 - MULCHING

1 - 4

EC-7 – GEOTEXTILES AND MATS

1 - 2

EC-8 – RUN-ON DIVERSION

1 - 6

EC-9 – SLOPE ROUGHENING, TERRACING, AND ROUNDING

1

CHAPTER 3 – SEDIMENT CONTROL

1 - 3

SC-1 – SILT FENCE OR FILTER FABRIC FENCE

1 - 7

SC-2 – STORM DRAIN INLET PROTECTION

1 - 4

SC-5 – VEGETATED BUFFER STRIPS AND CHANNELS

1 - 3

SC-6 – EARTH DIKE

1 - 3

SC-7 – TEMPORARY DRAINS AND SWALES

1 - 5

SC-8 – COMPOST FILTER BERM

1 - 3

SC-10 – LEVEL SPREADER

1 - 4

SC-11 – SLOPE DRAINS AND SUBSURFACE DRAINS

1 - 2

SC-12 – TOP AND TOE OF SLOPE DIVERSION DITCHES/BERMS

1 - 3

SC-13 – SANDBAG BARRIER

1 - 3

SC-14 – BRUSH OR ROCK FILTER

1 - 3

NGPC/NPDES – INTERSTATE RTE. H-1, GUARDRAIL & SHOULDER IMPTS., MIDDLE ST. TO PUNCHBOWL OFF-RAMP – DOH LETTER R10E927.FNL.16