AIR TRAFFIC CONTROL TOWER REPAIRS

Kalaeloa Airport

Barbers Point, Oahu, Hawaii

Project No. AO5024-03

Archive – xxxx

 

 

INDEX TO DRAWINGS

 

SHEET NO.

DESCRIPTION

1

G000

TITLE SHEET, ISLAND MAP, VICINITY MAP

2

G001

INDEX TO DRAWINGS, BUILDING DATA, SYMBOLS

3

G002

ABBREVIATIONS

 

 

 

4

A001

SITE PLAN

5

A002

DEMOLITION FLOOR PLAN, RENOVATED FLOOR PLAN

6

A003

DEMO REFLECTED CEILING PLAN, NEW REFLECTED CEILING FAN

7

A004

INTERIOR ELEVATIONS

8

A005

CABINETRY DETAILS

9

A006

RENOVATED GROUND FLOOR LOBBY PLAN

10

A006.1

RENOVATED SECOND FLOOR PLAN

11

A007

RENOVATED GROUND FLOOR LOBBY REFLECTED CEILING FAN

12

A007.1

RENOVATED SECOND FLOOR REFLECTED CEILING PLAN

13

A008

ROOF PLAN

 

 

 

14

F001

FIRE PROTECTION NOTES, SYMBOLS, AND ABBREVIATIONS

15

FD101

ATCT - FIRE ALARM GROUND FLOOR DEMO PLAN

16

FD102

FIRE PROTECTION NOTES, SYMBOLS, AND ABBREVIATIONS

17

FA101

ATCT BASEMENT AND GROUND FLOOR – FIRE ALARM PLAN

18

FA102

ATCT SECOND AND UPPER FLOOR – FIRE ALARM PLAN

19

F601

FIRE ALARM SEQUENCE OF OPERATIONS AND RISER DIAGRAM

 

 

 

20

E000

ELECTRICAL SYMBOLS, DEMOLITION NOTES, ENERGY CALCULATIONS, LUMINAIRE SCHEDULE

 

 

 

21

ED100

CONTROL TOWER ELECTRICAL DEMOLITION PLAN

22

E100

CONTROL TOWER ELECTRICAL PLAN – NEW WORK

23

ED200

GROUND FLOOR POWER DEMOLITION PLAN

24

ED201

SECOND FLOOR POWER DEMOLITION PLAN

25

ED202

THIRD FLOOR ELECTRICAL DEMOLITION PLAN

26

E200

GROUND FLOOR LIGHTING PLAN

27

E201

SECOND FLOOR LIGHTING PLAN

28

E202

GROUND FLOOR POWER PLAN – NEW WORK

29

E203

SECOND FLOOR POWER PLAN – NEW WORK

30

E204

THIRD FLOOR ELECTRICAL PLAN – NEW WORK

31

E300

PANEL SCHEDULES, SINGLE LINE DIAGRAM

 

 

 

32

M001

MECHANICAL GENERAL NOTES AND LEGEND

33

MD101

AIR TRAFFIC CONTROL TOWER, 1ST LEVEL MECHANICAL REMOVAL PLAN

34

M101

AIR TRAFFIC CONTROL TOWER, 1ST LEVEL MECHANICAL NEW WORK PLAN

35

M102

AIR TRAFFIC CONTROL TOWER, 1ST LEVEL MECH PIPING AND INSTRUMENTATION PLAN

36

MD103

AIR TRAFFIC CONTROL TOWER, 2ND LEVEL MECHANICAL REMOVAL PLAN

37

M103

AIR TRAFFIC CONTROL TOWER, 2ND LEVEL MECHANICAL NEW WORK PLAN

38

M104

AIR TRAFFIC CONTROL TOWER, 2ND LEVEL REF PIPING AND INSTRUMENTATION PLAN

39

MD105

AIR TRAFFIC CONTROL TOWER, 3RD LEVEL MECHANICAL REMOVAL PLAN

40

M105

AIR TRAFFIC CONTROL TOWER, 3RD LEVEL MECHANICAL NEW WORK PLAN

41

MD106

AIR TRAFFIC CONTROL TOWER, 4TH LEVEL MECHANICAL REMOVAL PLAN

42

M106

AIR TRAFFIC CONTROL TOWER, 4TH LEVEL MECHANICAL NEW WORK PLAN

43

M501

HVAC SCHEMATIC DIAGRAMS

44

M502

MECHANICAL DETAILS

45

M601

EQUIPMENT SCHEDULES

 

 

 

46

P001

PLUMBING GENERAL NOTES, SCHEDULES, AND LEGEND

47

P101

AIR TRAFFIC CONTROL TOWER, 2ND LEVEL PLUMBING FLOOR PLAN

48

P102

AIR TRAFFIC CONTROL TOWER, 4TH LEVEL PLUMBING PLAN

49

P901

NORTHWEST ATCT WINDOW WASHDOWN ISOMETRIC