FORT BARRETTE ROAD

OPERATIONAL IMPROVEMENTS

Roosevelt Avenue to Farrington Highway

Project No. 901A-01-19

Archive – 0901-1000-D2C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 17

CATCH WATER BASIN (CWB) NOTICE OF INTENT (NOI) FORM (SUBMISSION NO. HNT-M874-HRRDV)

1 - 6

MEMORANDUM OF UNDERSTANDING (MOU) – STATE DOT HIGHWAYS DIVISION AND CITY DEPARTMENT OF ENVIRONMENTAL SERVICES AND FACILITIES MAINTENANCE

1

CWB NOI FORM – SECTION 5 (TAX MAP KEY)

1 - 6

NOI FORM C

1

SITE SPECIFIC BMPS PLAN ATTACHMENTS – ATTACHMENT A – PROJECT SITE MAPS AND CONSTRUCTION PLANS/DRAWINGS

1

ATTACHMENT 1 – PROJECT LOCATION

1 - 2

ATTACHMENT 2 – DISCHARGE POINTS AND STATE WATERS

1

ATTACHMENT 3 – FEMA FLOOD HAZARD MAP

1

ATTACHMENT 4 – DRAINAGE CALCULATIONS

1 - 6

ATTACHMENT 5 – PERMITTED AREAS AND PROJECT TOPOGRAPHY

1

ATTACHMENT 6 – CONSTRUCTION DRAWINGS (COVER)

1 - 16

CONSTRUCTION DRAWINGS

1 - 2

(MEMO) WAIVER OF DETAILED PLAN REVIEW

1 - 6

GRADING PLAN REVIEW FOR HIGHWAYS DIVISION PROJECTS

1 - 8

NON APPLICABILITY FOR DETAILED PLAN REVIEW FOR PROJECTS REQUIRING GRADING PERMITS

1

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) COVER

1 - 54

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTICE OF GENERAL PERMIT COVERAGE (NGPC) FILE NO. HIR10F984

1

SWPPP ATTACHMENTS – ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 6

ATTACHMENT A – SITE-SPECIFIC BMP – FT. BARRETTE ROAD OPERATIONAL IMPTS.

1

PROJECT LOCATION

1

ATTACHMENT A-3 DISCHARGE POINTS AND STATE WATERS

1 - 2

ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

ATTACHMENT C – CONSTRUCTION SCHEDULE

1

ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

ATTACHMENT E3 – HDOT HIGHWAYS OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART; HDOT CONSTRUCTION DISCHARGE REPORT FORM

1 - 3

ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 5

ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS., DOCS OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO. AS REQUESTED BY THE DIRECTOR

1 - 3

ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1 - 2

ATTACHMENT L – SWPPP MODIFICATION LOG

1 - 3

LETTER TO DOH REGARDING REVIEW AND APPROVAL OF NOI – FT. BARRETTE ROAD

1 - 3

LETTER FROM DOH REGARDING NGPC/NPDES – FT. BARRETTE ROAD, FILE NO. HI R10F984