Replacement of Maipalaoa Bridge
Federal-Aid Project No. BR-093-1(21)
Archive – 0093-1009-D1C1
1
SSCBMP PLAN TRAINING LOG – ATTACHMENT B
CONSTRUCTION SCHEDULE - ATTACHMENT C
SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS – ATTACHMENT D
1 - 5
SSCBMP INSPECTION REPORT FORM – ATTACHMENT E
1 - 2
CONTINGENCY PLAN – ATTACHMENT F
SSCBMP AMENDMENT LOG – ATTACHMENT G
1 - 4
NOTICE OF GENERAL PERMIT COVERAGE (NGPC), NATIONAL POLLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) – FINAL, LETTER TO DOH (R10E104.FNL.12)
ADMIN EXTENSION OF NGPC (HI R10E104)
1 - 7
NOI RENEWAL FORM C (HI R10E104)
RENEWAL NGPC (HI R10E104)
1 - 13
HI DOH E-PERMIT CWB NOI FORM
1 - 10
NOI FORM F
NOI FORM F – ATTACHMENT A, MAPS AND FLOW CHART
ATTACHMENT A.1 – LOCATION MAP
ATTACHMENT A.2 – TOPOGRAPHIC MAP
ATTACHMENT A.3 – FLOW CHART
ATTACHMENT 4 – DECHLORINATION SCHEMATIC SYSTEM
ATTACHMENT A.5 – WATERLINE A PLAN AND PROFILE
ATTACHMENT B – WATER QUALITY ANALYSIS
ATTACHMENT B.1 – CONSUMER CONFIDENCE REPORT
1 - 6
ATTACHMENT C – GLOSSARY OF CHEMICALS
ATTACHMENT D – HYDROTESTING BMP’S PLAN
1 - 3
ATTACHMENT D.1 – HYDROTESTING BMP’S
ATTACHMENT E – ADDITIONAL INFORMATION
NGPC
CWB NOI FORM G – ORIGINAL (LETTER TO DOH)
CWB NOI GENERAL FORM APPENDIX G
1 - 16
CWB NOI FORM G
CWB-NOI FORM G NPDES (LIST OF SUPPORTING DOCUMENTS)
ITEM G.2.A – LOCATION MAP
ITEM G.2.B – TOPOGRAPHIC MAP
ITEM G.3 – FLOW CHART
ITEM G.4.F – SHPD REVIEW LETTER
ITEM G.6.C – CONSTRUCTION SCHEDULE
1 - 19
ITEM G.8.B – SOURCE WATER DATA
1 - 21
ITEM G.9.I – WATER QUALITY REPORT
ITEM G.12.A(I) – DEWATERING PUMP
ITEM G.12.A(II) – DEWATERING AND SEDIMENT REMOVAL PROCESS
1 - 8
ITEM G.12.A(II.A) – ROLL-OFF TANK INFORMATION SHEETS
ITEM G.12.A(II.B) – TEMPORARY CATCH BASIN FILTER INFORMATION SHEETS
ITEM G.12.A(IV) – DEWATERING CALCULATIONS
NPDES NGPC DEWATERING
ADMIN EXTENSION OF NGPC FORM G
NOI RENEWAL FORM G
RENEWAL NGPC
LETTER TO DOH – WQC - FINAL
CWB-WQC APPLICATION
CWB-WQC APPLICATION CHECKLIST
ATTACHMENT C – LOCATION MAP (WQC)
ATTACHMENT D - PLANS
ATTACHMENT E – SITE PLAN
ATTACHMENT F – DEWATERING PLAN
ATTACHMENT G – SAMPLE DEWATERING
ATTACHMENT H – APPLICABLE MONITORING AND ASSESSMENT PROGRAM (AMAP)
APPENDIX A
ATTACHMENT I – DPP APPROVAL LETTER
DOH LETTER – WITHDRAWAL OF SECTION 401 WQC
SMA MINOR APPLICATION - FINAL
DPP SMA APPROVED
INDEMNIFICATION AGREEMENT
1 - 62
FINAL ARCHAEOLOGICAL MONITORING PLAN
1 - 20
FINAL AMAP