FARRINGTON HIGHWAY

Replacement of Makaha Bridge No. 3

And Makha Bridge 3A

Federal Aid Project No. BR-093-1(20)

Archive – 0093-1006-D1C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 3

NATIONWIDE PERMIT VERIFICATION FOR MAKAHA BRIDGE NO. 3; DEPT. OF ARMY LTR. DATED SEPT. 23, 2019, FILE NO. POH-2006-00310

1 - 9

DRAWINGS

1 - 10

NATIONWIDE PERMIT

1

COMPLIANCE CERTIFICATION

 

 

1 - 3

NATIONWIDE PERMIT VERIFICATION FOR MAKAHA BRIDGE 3-A, DEPT. OF ARMY LTR. DATED SEPT. 24, 2019, FILE NO. POH-2014-00077

 

 

1

FINAL ARCHAEOLOGICAL MONITORING PLAN - COVER

1 - 2

MANAGEMENT SUMMARY

1

TABLE OF CONTENTS

1 - 3

LIST OF FIGURES AND TABLES

1 - 8

SECTION 1 INTRODUCTION

1 - 31

SECTION 2 BACKGROUND RESEARCH

1 - 3

SECTION 3 ARCHAEOLOGICAL MONITORING PROVISIONS

1 - 6

SECTION 4 REFERENCES CITED

1 - 32

APPENDIX A HISTORIC PROPERTY DESCRIPTIONS

1 - 6

APPENDIX B SHPD CORRESPONDENCE

 

 

1 - 18

MEMORANDUM OF AGREEMENT

 

 

1 - 3

NOTICE OF GENERAL PERMIT (NGPC); NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), FILE NO. HI R10G150, DOH LTR. DATED JULY 6, 2020

 

 

1 - 3

RENEWAL NOTICE OF GENERAL PERMIT (NGPC); NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), FILE NO. HI 12GE237, DOH LTR. DATED OCT. 22, 2019

 

 

1

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) - COVER

1 - 54

SWPPP DOCUMENTS

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 33

ATTACHMENT A-1 EROSION AND SEDIMENT CONTROL PLAN SHEETS

1 - 2

ATTACHMENT A-2 MAP SHOWING THE LOCATIONS OF THE OUTFALLS

1 - 9

ATTACHMENT A-3 ARMY CORPYS JURISDICTIONAL BOUNDARY MAPS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

OAHU ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

OAHU ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

OAHU ATTACHMENT E3 – HDOT HIGHWAYS OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART

1 - 3

OAHU ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 4

OAHU ATTACHMENT E5 – RECEIVING STATE WATERS INSPECTION REPORT FOR INDIVIDUAL NPDES PERMITS

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS. FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS, DOCS OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO. AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG