Federal Aid Project No. NH-083-1(43)
Archive – 0083-1006-D1C1
INDEX TO DRAWINGS |
|
SHEET NO. |
DESCRIPTION |
1 |
TITLE SHEET |
2 |
STANDARD PLANS SUMMARY |
3 |
GENERAL NOTES |
4 – 5 |
UTILITY NOTES |
5A – 5B |
WATER POLLUTION AND EROSION CONTROL NOTES |
6 – 7 |
GENERAL PLANS |
8 – 10 |
TYPICAL SECTIONS |
11 – 27 |
ROADWAY PLANS |
28 |
EROSION CONTROL MEASURES |
29 – 37 |
DRAINAGE PLANS |
38 – 40 |
DRAINAGE DETAILS |
41 - 45 |
BRIDGE PLANS |
46 – 64 |
SIGNING & PAVEMENT MARKING PLANS, LEGEND, DETAILS AND NOTES |
65 |
DRAINAGE SUMMARY AND UTILITY & MONUMENT ADJUSTMENT SCHEDULE |
66 – 67 |
TRAFFIC CONTROL PLANS |
68 – 71 |
SUPERELEVATION PLANS |
72 – 98 |
STRUCTURAL PLANS |
99 – 118 |
ELECTRICAL PLANS |