MOKAPU SADDLE ROAD REHABILITATION

Nanamoana Street to Oneawa Street

Federal Aid Project No. STP-065-1(011)

Archive – 0065-1007-D1C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 29

CATCH WATER BASIN (CWB) INDIVIDUAL NPDES FORM

1 - 2

CERTIFICATION STATEMENT – MOKAPU SADDLE ROAD REHABILITATION

FINAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT NO. HI S000482

1 - 2

AUTHORIZATION TO DISCHARGE UNDER THE NPDES

1

TABLE OF CONTENTS

1 - 2

PART A. GENERAL REQUIREMENTS

1 - 2

PART B. REPORTING REQUIREMENTS

1 - 3

PART C. BEST MANAGEMENT PRACTICES (BMPs)

1 - 2

PART D. MAPS (LOCATION MAP & OUTFALL MAP)

1

FORM C ATTACHMENT A-1 LOCATION AND OUTFALL MAPS – TITLE SHEET

1 - 7

LOCATION AND OUTFALL MAPS

1

FORM C ATTACHMENT A-2 TABLES AND CALCULATIONS – TITLE SHEET

1 - 8

TABLES AND CALCULATIONS

1

FORM C ATTACHMENT A-3 PORTIONS OF CONTRACT PLANS – TITLE SHEET

1 - 15

PORTIONS OF CONTRACT PLANS

1

FORM C ATTACHMENT A-4 CITY & COUNTY OF HONOLULU GRADING ORDINANCE LETTER OF AGREEMENT – TITLE SHEET

1 - 14

C&C OF HONOLULU GRADING ORDINANCE LOA

1

FORM C ATTACHMENT A-5 FLOW CHART – TITLE SHEET

1 - 5

FLOW CHART

1

FORM C ATTACHMENT A-6 FLOOD PLAIN BOUNDARY MAP – TITLE SHEET

1

FLOOD PLAIN BOUNDARY MAP

1 - 6

NPDES FORM C – MOKAPU SADDLE ROAD REHABILITATION

1

NPDES FORM C – ATTACHMENT

1

SWPPP ATTACHMENT A-1 BMP MAPS – TITLE SHEET

1 - 12

BMP MAPS

1 - 49

SWPPP FORM – MOKAPU SADDLE ROAD

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

SWPPP ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

SWPPP ATTACHMENT E2 – DISCHARGE REPORT FOR OAHU

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 5

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS., DOCS. OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, & OTHER INFO. AS REQUESTED BY THE DIR

1 – 3

 

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

1

TMK MOKAPU SADDLE ROAD

 

 

1

FINAL ARCHAEOLOGICAL MONITORING PLAN – MOKAPU SADDLE ROAD (COVER SHEET)

1 - 3

MANAGEMENT SUMMARY

1 - 2

TABLE OF CONTENTS

1 - 2

LIST OF FIGURES AND TABLES

1 - 10

SECTION 1 - INTRODUCTION

1 - 26

SECTION 2 – TRADITIONAL AND HISTORICAL BACKGROUND

1 - 19

SECTION 3 – PREVIOUS ARCHAEOLOGICAL RESEARCH

1 - 3

SECTION 4 – ARCHAEOLOGICAL MONITORING PROVISIONS

1 - 9

SECTION 5 – REFERENCES CITED

1 - 15

APPENDIX A – NHPA SECTION 106 EFFECT DETERMINATION DATED MAY 13, 2014

1 - 2

APPENDIX B – SHPD NHPA SECTION 106 AND HRS CHAPTER 6E-8 REVIEW DATED JUNE 3, 2014

1 - 16

APPENDIX C – FHWA LETTER TO SHPO LETTER DATED JUNE 11, 2015

1 - 2

APPENDIX D – SHPD CHAPTER 6E AND NHPA SECTION 106 CONSULTATION CONCURRENCE WITH DETERMINATION REVIEW DATED MARCH 28, 2017