PALI HIGHWAY RESURFACING

Vineyard Boulevard to Waokanaka Street

Federal-Aid Project No. NH-061-1(036)

Archive – 0061-1012-D1C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 43

CWB NOI FORM

 

 

1 - 7

NOI FORM C

 

 

1

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) - COVER

1 - 53

SWPPP REPORT

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1 - 2

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1 - 3

OAHU ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

OAHU ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

OAHU ATTACHMENT E3 – HDOT HIGHWAYS OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART

1 - 5

OAHU ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 10

KAUAI/MAUI/HAWAII ATTACHMENT E1 – HDOT INSPECTION REPORT

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS, DOCS OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

 

 

1 - 2

E-PERMITTING NOTICE OF INTENT (NOI) SUBMISSIONS

 

 

1

CERTIFICATION OF THE CWB SWPPP

 

 

1 - 3

NOTICE OF GENERAL PERMIT COVERAGE (NGPC) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), FILE NO. HI R10F938

 

 

 

 

1 - 11

COMMUNITY NOISE PERMIT #O 20-263 APPROVAL

12 - 18

VARIANCE (DOCKET NO. 17-NR-VN-34) FOR COMMUNITY NOISE CONTROL

19 - 20

GEOTECHNICAL ENGINEERING EXPLORATION COVER FOR PALI HIGHWAY RESURFACING VINEYARD BOULEVARD TO WAOKANAKA STREET

21

GEOLAB LETTER DATED JULY 7, 2020

22 - 23

GEOTECHNICAL TABLE OF CONTENTS

24 - 25

SUMMARY OF FINDINGS AND RECOMMENDATIONS

26 - 28

SECTION 1. GENERAL

29 - 36

SECTION 2. SITE CHARACTERIZATION

37 - 52

SECTION 3. DISCUSSION AND RECOMMENDATIONS

53 - 54

SECTION 4. LIMITATIONS

55

CLOSURE

56

PLATES (COVER)

57

PROJECT LOCATION MAP (PLATE 1)

58

GENERAL SITE PLAN (PLATE 2)

59 - 70

SITE PLANS (PLATES 3.1 THRU 3.12)

71 - 73

SUMMARY OF DYNAMIC CONE PENETRATION TEST DATA (PLATES 4.1 THRU 4.3)

74 - 76

CORRELATIONS OF PENETRATION INDEX AND CALIFORNIA BEARING RATIO (PLATES 5.1 THRU 5.3)

77

SUMMARY OF PAEMENT DESIGN RECOMMENDATIONS (PLATE 6)

78

SOFT SUBGRADE STABILIZATION DETAIL (PLATE 7)

79

APPENDIX A (COVER)

80

FIELD EXPLORATION

81

SOIL LOG LEGEND

82

SOIL CLASSIFICATION LOG KEY

83

ROCK LOG LEGEND

84 - 114

LOGS OF BORINGS

115

APPENDIX B (COVER)

116

DYNAMIC CONE PENETRATION TESTS

117 - 208

DYNAMIC CONE PENETRATION TEST FIELD LOGS

209

APPENDIX C (COVER)

210

LABORATORY TESTS

211 - 227

LABORATORY TEST DATA

228

APPENDIX D (COVER)

229 - 235

PAVEMENT DESIGN/PAVEMENT CALCULATIONS

236

APPENDIX E (COVER)

237 - 258

PHOTOGRAPHS OF AC CORES

259

APPENDIX F (COVER)

260 - 263

PHOTOGRAPHS OF ROADWAY SURVEY

 

 

 

 

1

ENVIRONMENTAL HAZARD MANAGEMENT PLAN (COVER)

1

TABLE OF CONTENTS

1

LIST OF ATTACHMENTS/FIGURES (COVER)

1

ACRONYMS AND ABBREVIATIONS

1

INTEGRAL CONSULTING, INC.

1 - 3

INTRODUCTION AND PURPOSE

1 - 2

BACKGROUND

1 - 2

SUMMARY OF SITE DATA

1 - 4

ENVIRONMENTAL HAZARDS EVALUATION

1

CONCLUSIONS

1

REFERENCES

1 - 4

FIGURES (LOCATION, TOPOGRAPHIC & IMPACTED AREA MAPS)

1 - 5

PLATES