FREEWAY MANAGEMENT SYSTEM

Phase 3, Unit 1

Federal Aid Project No. NH-0300(152)

Archive – OAHU-1017-D5C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 6

NOI – FORM C

1

NOI – FORM C SITE SPECIFIC BMPS PLAN ATTACHMENTS – ATTACHMENT A – PROJECT SITE MAPS AND CONSTRUCTION PLANS/DRAWINGS (COVER)

1 - 4

ATTACHMENT A – 1 VICINITY AND LOCATION MAPS – FORM C

1 - 20

ATTACHMENT A – 2 SITE AND BMP PLANS – FORM C

1 - 20

ATTACHMENT A – 3 DRAINAGE MAPS – FORM C

1 - 11

ATTACHMENT A – 4 OUTFALL MAPS – FORM C

1 - 6

ATTACHMENT A – 5 FLOOD MAPS – FORM C

1 - 2

ATTACHMENT A – 6 BMP DETAILS – FORM C

1 - 2

ATTACHMENT B – DRAINAGE CALCULATIONS – FORM C

1 - 13

ATTACHMENT C – CCH LETTER OF AGREEMENT – FORM C

 

 

1 - 44

CWB NOI FORM

 

 

1 - 4

NOISE VARIANCE (DOCKET NO. 21-NR-VN-09)

 

 

1 - 3

NOTICE OF GENERAL PERMIT COVERAGE (NGPC) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FREEWAY MANAGEMENT SYSTEM, PH. 3, UNIT 1, FAP NO. NH-0300(152); FILE NO. HIR10G351

 

 

1 – 54

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

OAHU ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM

1 - 3

OAHU ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

OAHU ATTACHMENT E3 – HDOT HIGHWAYS OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART

1 - 3

OAHU ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURERS SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOC., DOC. OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO. AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

 

 

1 - 42

ARCHAEOLOGICAL MONITORING PLAN

1 - 46

APPENDIX A:  BACKGROUND SECTIONS FOR AREAS 2 AND 3

1 - 10

APPENDIX B:  PLAT MAPS FOR TMK PARCELS ADJACENT TO THE AREA 1 APE

1 - 5

APPENDIX C:  SELECTED PROJECT SITE PLANS

 

 

1

GEOTECHNICAL REPORT, W.O. 6891-30(A) COVER

1 - 4

GEOTECHNICAL REPORT LETTER AND TABLE OF CONTENTS

1

SUMMARY OF FINDINGS AND RECOMMENDATIONS

1 - 3

SECTION 1 - GENERAL

1 - 4

SECTION 2 – SITE CHARACTERIZATION

1 - 6

SECTION 3 – DISCUSSION AND RECOMMENDATIONS

1 - 2

SECTION 4 - LIMITATIONS

1

CLOSURE

1

PLATE 1 – PROJECT LOCATION MAP

1 - 5

PLATES 2.1 THRU 2.5 – SITE PLANS

1 - 11

APPENDIX A – FIELD EXPLORATION

1 - 11

APPENDIX B – LABORATORY TESTS

1 - 3

APPENDIX C – PHOTOGRAPHS OF CORE SAMPLES