FREEWAY MANAGEMENT SYSTEM

Phase 3A

Federal-Aid Project No. NH-0300(175)R

Archive – OAHU-1017-D4C2

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 17

CWB NOI FORM – SUBMISSION ID HP7-GFQJ-0PNDA

 

 

1 - 4

NOTICE OF GENERAL PERMIT COVERAGE (NGPC), NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), FREEWAY MANAGEMENT SYSTEM PHASE 3A, FILE NO. H1R10G456

 

 

1 - 6

NOI FORM C

1

SITE SPECIFIC BMPS PLAN ATTACHMENTS – ATTACHMENT A – PROJECT SITE MAPS AND CONSTRUCTION PLANS/DRAWINGS

1 - 3

ATTACHMENT A – 1, LOCATION MAPS-FORM C

1 - 3

ATTACHMENT A - 2, SITE AND BMP PLANS-FORM C

1 - 3

ATTACHMENT A – 3, DRAINAGE MAPS-FORM C

1 - 3

ATTACHMENT A – 4, DISTURBED AREAS EXHIBITS-FORM C

1 - 2

ATTACHMENT B – DRAINAGE CALCULATIONS-FORM C

1 - 13

ATTACHMENT C – CCH LETTER OF AGREEMENT-FORM C

 

 

1

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) COVER – FREEWAY MANAGEMENT SYSTEM, PHASE 3A

1 - 53

SWPPP DOCUMENTS

1 - 58

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 3

OAHU ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM FOR OAHU

1 - 3

OAHU ATTACHMENT E2 – CORRECTIVE ACTION REPORTS

1 - 7

OAHU ATTACHMENT E3 – HDOT HIGHWAYS OAHU CONSTRUCTION DISCHARGE RESPONSE FLOW CHART; HDOT CONSTRUCTION DISCHARGE REPORT FORM

1 - 3

OAHU ATTACHMENT E4 – MONTHLY COMPLIANCE REPORT

1 - 5

ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECIFICATIONS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS., DOCS OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO. AS REQUESTED BY DIR

1 - 3

ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

ATTACHMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

ATTACHMENT L – SWPPP MODIFICATION LOG