FREEWAY MANAGEMENT SYSTEM

INTERSTATE H-1, H-2 AND MOANALUA FREEWAY (H-201)

PHASE 1C, PART 2

Federal-Aid Project No. IM-0300(138)

Archive – OAHU-1017-D2C8

 

PERMITS, REPORTS AND OTHER DOCUMENTS

SECTION

DESCRIPTION

1 - 4

NOISE VARIANCE (DOCKET NO. 14-NR-VN-16)

 

 

1 - 3

NOTICE OF GENERAL COVERAGE (NGPC) & NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FILE NO. H1 R10E377, PERMIT APPROVAL

1 – 3

E-PERMITTING NOTICE OF INTENT (NOI) SUBMISSIONS

1 - 33

HI DOH E-PERMITTING SYSSTEM, CATCH WATER BASIN (CWB) NOI FORM

1 THRU 115

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) – NOTICE OF INTENT (NOI) FORM C

1 - 7

NOTICE OF INTENT (NOI) FORM C – [C-1 THRU C-9]

8

SITE SPECIFIC BMPS PLAN ATTACHMENTS

ATTACHMENT A – PROJECT SITE MAPS AND CONSTRUCTION PLANS/DRAWINGS (SECTION C.8)

9

FORM C ATTACHMENT A-1 –

LOCATION AND OUTFALL MAPS

10 – 30

LOCATION MAPS

31

FORM C ATTACHMENT A-2 -

DRAINAGE SUMMARY AND DRAINAGE CALCULATIONS

32 - 34

DRAINAGE SUMMARY AND CALCULATIONS

35

FORM C – ATTACHMENT A-3 –

SITE PLANS

36 - 57

SITE PLANS AND EROSION CONTROL DETAILS

58

FORM C ATTACHMENT A-4 –

DRAINAGE AREA MAPS

59 - 84

DRAINAGE MAPS

85

FORM C ATTACHMENT A-5 –

100 YEAR FLOOD ZONE MAPS

86 - 97

100-YEAR FLOOD ZONE MAPS

98

FORM C ATTACHMENT A-6 –

C&C HONOLULU GRADING ORDINANCE LETTER OF AGREEMENT

99 - 110

C&C HONOLULU DEPARTMENT OF PLANNING & PERMITTING (DPP) – GRADING PERMIT ORDINANCES

111

SITE SPECIFIC BMPS PLAN ATTACHMENTS

ATTACHMENT B – CONSTRUCTION SCHEDULE

112 - 115

SCHEDULES

1 THRU 138

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

2 - 3

TABLE OF CONTENTS

4 - 52

SWPPP DOCUMENTS

53

SWPPP ATTACHMENTS – ATTACHMENT A

CONTRACTOR/SUB-CONTRACTOR CONTROL, PROPERTY BOUNDARY, STATE WATERS, AND BMP MAPS, AND BMP DETAILS (SWPPP SECTIONS 7.2.4, 7.2.6.1, 7.2.6.2 TO 7.2.6.8 AND 7.2.10)

54

SWPPP ATTACHMENT A-1 – LOCATION MAPS

55 - 57

LOCATION MAPS

58

SWPPP ATTACHMENT A-2 - PORTIONS OF CONTRACT SITE PLANS

59 - 76

SITE PLANS

77

SWPPP ATTACHMENT A-3 – SEQUENCING AND CONSTRUCTION ACTIVITY BMP DIAGRAMS

78 - 103

SEQUENCING AND CONSTRUCTION ACTIVITY BMP DIAGRAM

104

SWPPP ATTACHMENT A – 4 – EROSION CONTROL DETAILS

105 - 107

EROSION CONTROL DETAILS

108 - 109

ATTACHMENT B – HDOT SWPPP TRAINING LOG (SWPPP SECTION 7.2.13)

110

ATTACHMENT C – CONSTRUCTION SCHEDULE (SWPPP SECTION 7.2.5)

111 - 114

CONSTRUCTION SCHEDULE

115

ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS (SWPPP SECTION 7.2.4)

116 - 118

ATTACHMENT E1 – SWPPP INSPECTION REPORT FORM (SWPPP SECTION 7.2.12)

119 - 121

ATTACHMENT E2 – DISCHARGE REPORT

122 - 126

ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES (SWPPP SECTION 7.2.11.1)

127 - 131

ATTACHMENT G – WASTE MANAGEMENT PROCEDURES (SWPPP SECTION 7.2.11.2)

132

ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURERS SPECS. FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCUMENTATION, DOCUMENTATION OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, & OTHER INFO.

(SWPPP SECTIONS 7.2.3, 7.2.9, 7.2.14, 7.2.15, 7.2.16)

133 - 135

ATTACHMENT I – CORRECTIVE ACTION REPORTS

136

ATTACHMENT J – MONTHLY COMPLIANCE REPORT

137

ATTACHMENT K – POST AUTHORIZATION ADDITIONS TO THE SWPPP

138

ATTACHMENT L – SWPPP MODIFICATION LOG

1 THRU 274

ARCHAEOLOGICAL MONITORING PLAN – FINAL REPORT

FEDERAL-AID PROJECT NO. IM-0300(138)

1

FINAL REPORT COVER

2

FINAL REPORT

3 - 6

TABLE OF CONTENTS

6 - 10

LIST OF FIGURES

10

LIST OF TABLES

11 - 14

CHAPTER 1

15 - 42

CHAPTER 2

43 - 64

CHAPTER 3

65 - 106

CHAPTER 4

107 - 131

CHAPTER 5

132 - 139

APPENDIX A – LCA 387

140 - 170

CHAPTER 6

171 - 173

APPENDIX A – LCA 10498

174 - 176

APPENDIX B – R.P. 10498

177 - 217

CHAPTER 7

218 - 235

CHAPTER 8

236 - 270

CHAPTER 9

271 - 272

APPENDIX A

273 - 274

CHAPTER 10