KALANIANAOLE HIGHWAY

Phase I

Project No. x-xx-xxx(xx)

Archive – xxxx

 

INDEX TO DRAWINGS

(FOR INFORMATION ONLY)

SHEET NO.

DESCRIPTION

PLAN SECTIONS & ELEVATIONS

CONCRETE PADS FOR RELIABLE CROSS CONNECT PAD MOUNT UNITS

 

DUCTLINE PLANS:

 

DUCTLINE LAYOUT

 

12kV UNDERGROUND DUCT LINE

1 - 2

CONTROL CONSOLE PLANS

1 - 3

KALANIANAOLE HIGHWAY TRANSFER SWITCH PAD

1 - 2

MISC. DETAILS HANDHOLES & MANHOLES UNDERGROUND STANDARDS

 

PULLBOX PLANS:

 

STANDARD DETAILS FOR PULLBOX

 

ROADWAY PULLBOX MODIFICATION

 

PULLBOX 2’ X 4’

 

PULLBOX 2’ X 6’

 

LARGE PULLBOX

 

HANDHOLE TYPE PLANS:

 

STANDARD

 

TYPE 46

 

TYPE 57

 

TYPE 611

1 - 2

TYPE A3

 

TYPE 35 & 35V

 

MANHOLE PLANS:

 

FRAME AND COVER

 

STRUCTURAL PLAN, SECTIONS & DET. UNDERGROUND DRAWINGS

 

TYPE 1

 

TYPE 4

 

TYPE 57M & 46M

 

TYPE A-1

1 - 2

TYPE V-1

 

ELECTRICAL

 

DETAILS