EWA AND DIAMOND HEAD CONCOURSE ROADWAY IMPROVEMENTS PHASE 1

Daniel K. Inouye International Airport

Honolulu, Oahu, Hawaii

Project No. AO1943-32

Archive – xxxx

 

INDEX TO DRAWINGS

SHEET NO.

DWG. NO.

DESCRIPTION

 

GENERAL SHEETS

1

G-001

TITLE SHEET

2 - 3

G-002-G-003

DRAWING INDEX

 

 

 

 

CIVIL DRAWINGS

4

C-001

CIVIL NOTES

5 - 6

C-002-C-003

CIVIL DETAILS

7

C-E-004

TYPICAL ROADWAY SECTIONS EWA WING

8 - 11

C-E-201-C-E-204

EWA WING LEVEL 2 – STA. 0+00 THRU STA. 17+57

12 - 13

C-E-701-C-E-801

ESCP EWA WING LEVELS 2 AND 3

14

C-D-004

TYPICAL ROADWAY SECTIONS DH WING

15 - 17

C-D-201-C-D-203

DH WING LEVEL 2 – STA. 11+76 THRU STA. 0+00

18 - 19

C-D-701-C-D-801

ESCP DH WING LEVELS 2 AND 3

 

 

 

 

STRUCTURAL DRAWINGS

20 - 21

S-001-S-002

STRUCTURAL NOTES

22

S-100

TYPICAL DETAILS

23 - 24

S-200-S-201

TYPICAL SPALL REPAIR DETAILS

25

S-202

TYPICAL CRACK REPAIR DETAILS

26 - 29

S-300-S-303

EXPANSION JOINT REPAIR DETAILS

30 - 31

S-400-S-401

PAVEMENT REPAIR DETAILS

32

S-402

EWA AND DH SECOND LEVEL DRAIN REPAIR

33

S-403

EWA THIRD LEVEL DRAIN REPAIR

34 - 35

S-404-S-405

LIGHT POLE REPAIR

36

S-500

ROADWAY PAVEMENT DEMOLITION DETAILS

37 - 38

S-501-S-502

ROADWAY EXPANSION JOINT DEMOLITION DETAILS

39

S-503

DIAMOND HEAD TRELLIS DEMOLITION

40

S-504

EWA TRELLIS DEMOLITION

41

S-505

TRELLIS DEMOLITION DETAILS

42

S-600

SECOND FLOOR PHASE 1 DUST CONTROL TYPICAL PLAN

43

S-601

SECOND FLOOR DUST CONTROL TURN AROUND PLAN

44 - 45

S-602-S-603

SECOND FLOOR PHASE 1 AND PHASE 2 DUST CONTROL DETAILS

46

S-E-200

EWA WING – SECOND FLOOR PLAN

47 - 59

S-E-201-S-E-213

EWA WING – SECOND FLOOR PARTIAL DEMOLITION PLAN A THRU PLAN M

60 - 62

S-E-214-S-E-216

EWA TYPICAL DEMOLITION SECTION

63 - 75

S-E-217-S-E-229

EWA WING – SECOND FLOOR PARTIAL REPAIR PLAN A THRU PLAN M

76

S-E-300

EWA WING – THIRD FLOOR PLAN

77 - 90

S-E-301-S-E-314

EWA WING – THIRD FLOOR PARTIAL PLAN A THRU PLAN N

91 - 93

S-E-400-S-E-402

EWA TYPICAL REPAIR SECTION

94

S-E-500

EWA – SECOND FLOOR PHASING PLAN

95

S-D-200

DIAMOND HEAD WING – SECOND FLOOR PLAN

96 - 103

S-D-201-S-D-208

DIAMOND HEAD WING – SECOND FLOOR PARTIAL DEMOLITION PLAN A THRU PLAN H

104 - 105

S-D-209-S-D-210

DIAMOND HEAD TYPICAL DEMOLITION SECTION

106

S-D-211

DIAMOND HEAD DEMOLITION SECTION AT TURN AROUND

107 - 114

S-D-212-S-D-219

DIAMOND HEAD WING – SECOND FLOOR PARTIAL REPAIR PLAN A THRU PLAN H

115

S-D-300

DIAMOND HEAD WING – THIRD FLOOR PLAN

116 - 124

S-D-301-S-D-309

DIAMOND HEAD WING – THIRD FLOOR PARTIAL PLAN A THRU PLAN I

125 - 126

S-D-400-S-D-401

DIAMOND HEAD TYPICAL REPAIR SECTION

127

S-D-402

DIAMOND HEAD REPAIR SECTION AT TURN AROUND

128

S-D-500

DIAMOND HEAD WING – SECOND FLOOR PHASING PLAN

 

 

 

 

MECHANICAL DRAWINGS

129

M-001

MECHANICAL LEGEND, NOTES AND SCHEDULES

130

M-002

MECHANICAL DETAILS

131 - 143

M-E-201-M-E-213

2ND FLOOR EWA MECHANICAL DEMOLITION PARTIAL PLAN A THRU PLAN M

144 - 156

M-E-214-M-E-226

2ND FLOOR EWA MECHANICAL PARTIAL PLAN A THRU PLAN M

157 - 169

M-E-301-M-E-313

3RD FLOOR EWA MECHANICAL DEMOLITION PARTIAL PLAN A THRU PLAN M

170 - 182

M-E-314-M-E-326

3RD FLOOR EWA MECHANICAL PARTIAL PLAN A THRU PLAN M

183 - 190

M-D-201-M-D-208

2ND FLOOR DH MECHANICAL DEMOLITION PARTIAL PLAN A THRU PLAN H

191 - 198

M-D-209-M-D-216

2ND FLOOR DH MECHANICAL PARTIAL PLAN A THRU PLAN H

 

 

 

 

ELECTRICAL DRAWINGS

199

E-E-001

ELECTRICAL SYMBOLS

200

E-E-300

EWA THIRD FLOOR SITE PLAN

201 - 213

E-E-301-E-E-313

DEMOLITION PLAN EWA 3RD FLOOR AREA 1 THRU AREA 13

214 - 226

E-E-314-E-E-326

NEW POWER AND LIGHTING PLAN EWA 3RD FLOOR AREA 1 THRU AREA 13

227

E-E-327

LIGHT FIXTURE MOUNTING DETAILS

228

E-D-300

DH THIRD FLOOR SITE PLAN

229 - 237

E-D-301-E-D-309

DEMOLITION PLAN DH 3RD FLOOR AREA 1 THRU AREA 9

238 - 246

E-D-310-E-D-318

NEW POWER AND LIGHTING PLAN DH 3RD FLOOR AREA 1 THRU AREA 9

247

E-D-319

LIGHT FIXTURE MOUNTING DETAILS