HALEAKALA HIGHWAY RECONSTRUCTION

North Firebreak Road to Old Haleakala Highway

Federal-Aid Project No. NH-037-1(028)

Archive – 0037-1010-D1C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 3

NOTICE OF GENERAL PERMIT COVERAGE (NGPC) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FOR HALEAKALA HWY RECONSTRUCTION, N. FIREBREAK RD TO OLD HALEAKALA HWY-FILE NO. HIR10G705 (DTD. MAY 12, 2022)

 

 

1

COVER LETTER TO DOH DIRECTOR (DTD. MAY 5, 2022)

1 - 2

TRANSMITTAL REQUIREMENTS AD CERTIFICATION STATEMENT FOR E-PERMITTING NOTICE OF INTENT (NOI) SUBMISSIONS

1

TABLE OF CONTENTS

1 - 20

CWB NOI FORM

1 - 2

ATTACHMENT A-1

1 - 12

ATTACHMENT A-2

1 - 4

ATTACHMENT A-3

1

ATTACHMENT A-4

1 - 4

ATTACHMENT A-5

1 - 13

ATTACHMENT A-6

1 - 13

ATTACHMENT A-7

 

 

1

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) COVER SHEET_DOH NGPC FILE NO HI R10G705

1 - 50

STORM WATER POLLUTION PREVENTION PLAN DOCUMENTS

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP TRAINING LOG

1

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 9

ATTACHMENT E1 – HDOT INSPECTION REPORT FOR KAUAI, MAUI AND HAWAII

1 - 5

SWPPP ATTACHMENT F – SPILL PREVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 3

SWPPP ATTACHMENT H – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOCS., DOCS OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, FUGITIVE DUST CONTROL PLAN AND OTHER INFO. AS REQUESTED BY DIR

1 - 3

SWPPP ATTACHMENT I – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT J – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACMENT K – POST-AUTHORIZATION ADDITIONS TO THE SWPPP

1

SWPPP ATTACHMENT L – SWPPP MODIFICATION LOG

 

 

 

SWPPP ATTACHMENTS:

1

ATTACHMENT A-1 – VICINITY AND LOCATION MAP

1 - 12

ATTACHMENT A-2 – PROPERTY BOUNDARY MAP

1 - 13

ATTACHMENT A-3 – DRAINAGE MAPPING

1 - 13

ATTACHMENT A-5 – SITE SPECIFIC BEST MANAGEMENT PRACTICES PLAN

1 - 3

ATTACHMENT A-6 – STAGING AREA DETAILS