KAUAI EMERGENCY FLOOD REPAIR AND CLEANUP AT VARIOUS
LOCATIONS APRIL 2018
In the Vicinity of MilePost 8.7 to 8.8
Federal-Aid Project No. ER-19(001)
Archive – 0056-1057-D1C6A
INDEX TO DRAWINGS
|
|
SHEET NO.
|
DESCRIPTION
|
1
|
TITLE SHEET
|
2
|
STANDARD PLANS SUMMARY
|
3
|
GENERAL NOTES AND
ABBREVIATIONS
|
4 - 6
|
GENERAL NOTES
|
7 - 8
|
WATERLINE NOTES
|
9 - 11
|
WATER
POLLUTION AND EROSION CONTROL NOTES
|
12
|
EROSION CONTROL DETAILS
|
13 - 15
|
CONSTRUCTION
PHASING AND EROSION CONTROL
|
16
|
ROADWAY CONSTRUCTION
|
17
|
ROADWAY PROFILE
|
18
|
WATERLINE PLAN AND PROFILE
|
19
|
TRAFFIC CONTROL NOTES
|
20
|
TRAFFIC CONTROL PLAN
|
21
|
INDEX TO STRUCTURAL DRAWINGS
|
22 - 23
|
STRUCTURAL GENERAL NOTES
|
24
|
SYMBOLS AND ABBREVIATIONS
|
25
|
TYPICAL JPCP PANEL DETAILS
|
26 - 27
|
PRECAST SLAB DETAILS
|
28
|
PRECAST WATERLINE JACKET
|