KAUAI EMERGENCY FLOOD REPAIR AND CLEANUP AT VARIOUS
LOCATIONS APRIL 2018
In the Vicinity of Milepost 9.5 tp 9.6
Federal-Aid Project No. ER-19(001)
Archive – 0056-1057-D1C6
INDEX TO DRAWINGS
|
|
SHEET NO.
|
DESCRIPTION
|
1
|
TITLE SHEET
|
2
|
STANDARD PLANS SUMMARY
|
3
|
GENERAL NOTES AND
ABBREVIATIONS
|
4 - 6
|
GENERAL NOTES
|
7 - 8
|
WATERLINE NOTES
|
9 - 11
|
WATER
POLLUTION AND EROSION CONTROL NOTES
|
12
|
EROSION CONTROL DETAILS
|
13 - 14
|
CONSTRUCTION
PHASING AND EROSION CONTROL
|
15
|
ROADWAY CONSTRUCTION
|
16
|
LIMAHULI WATERLINE
PLAN AND PROFILE
|
17
|
TRAFFIC CONTROL NOTES
|
18
|
TRAFFIC CONTROL PLAN
|
19
|
INDEX TO STRUCTURAL DRAWINGS
|
20 - 21
|
STRUCTURAL GENERAL NOTES
|
22
|
SYMBOLS AND ABBREVIATIONS
|
23
|
JPCP LAYOUT PLAN
|
24
|
TYPICAL JPCP PRECAST
PANEL DETAILS
|
25 - 26
|
TYPICAL JPCP PRECAST SLAB
DETAILS
|
27
|
WATERLINE JACKET
|
28
|
PRECAST PLANK
PLAN, ELEVATION AND DETAIL
|
29
|
PRECAST PLANK REINFORCING
SECTIONS
|
30
|
PRECAST FOOTING SECTIONS
|