KUHIO HIGHWAY

Repairs to Wailua River Bridge

Federal-Aid Project No. ER-23(001)

Archive – 0056-1061-D1C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1 - 21

AN ARCHAEOLOGICAL MONITORING PLAN FOR THE PROPOSED MODIFICATIONS TO THE WAILUA RIVER BRIDGE AND WAILUA PLANTATION BRIDGE

 

1 - 14

GEOTECH REPORT – TECHNICAL MEMORANDUM

1 - 37

SECTION 404 PERMIT – WAILUA BRIDGE

 

1 - 11

RIGHT-OF-ENTRY PERMIT TO MITIGATE SAND EROSION AT THE WAILUA BRIDGE (REF. NO. 20KD-036)

1 - 6

RIGHT-OF-ENTRY PERMIT TO USE PORTION OF WAILUA RIVER STATE PARK (LTR. DATED MAR. 17, 2021)

 

 

1 - 8

AS-BUILT DRAWINGS

 

 

1 - 79

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND IN-WATER POLLUTION PREVENTION PLAN (IWPPP)

1

SWPPP ATTACHMENT A – CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS

1 - 2

SWPPP ATTACHMENT B – HDOT SWPPP/IWPPP TRAINING LOG

1 - 2

SWPPP ATTACHMENT C – CONSTRUCTION SCHEDULE

1

SWPPP ATTACHMENT D – SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS

1 - 7

SWPPP ATTACHMENT E1 – DISCHARGE RESPONSE FLOW CHART AND DISCHARGE REPORT

1 - 10

SWPPP ATTACHMENT E2 – HDOT SWPPP INSPECTION REPORT FOR KAUAI, MAUI, AND BIG ISLAND LAND-BASED BMPS

1 - 6

SWPPP ATTACHMENT E3 – HDOT INSPECTION REPORT FOR IN-WATER WORK

1 - 5

SWPPP ATTACHMENT F – SPILL PRVENTION AND RESPONSE PROCEDURES

1 - 7

SWPPP ATTACHMENT G – WASTE MANAGEMENT PROCEDURES

1 - 2

SWPPP ATTACHMENT H – CONTINGENCY PLAN

1

SWPPP ATTACHMENT I – EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURER’S SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOC, DOC OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, AND OTHER INFO. AS REQUESTED BY THE DIR

1 - 3

SWPPP ATTACHMENT J – CORRECTIVE ACTION REPORTS

1

SWPPP ATTACHMENT K – MONTHLY COMPLIANCE REPORT

1

SWPPP ATTACHMENT L – POST-AUTHORIZATION ADDITIONS TO THE SWPPP/IWPPP (INCLUDING ARMY CORPS PCN AND SPECIAL CONDITIONS)

1

SWPPP ATTACHMENT M – SWPPP/IWPPP AMENDMENT LOG