KUHIO HIGHWAY
Repairs to Wailua River Bridge
Federal-Aid Project No. ER-23(001)
Archive 0056-1061-D1C1
PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS
SECTION
DESCRIPTION
1 - 21
AN ARCHAEOLOGICAL MONITORING PLAN FOR THE PROPOSED MODIFICATIONS TO THE WAILUA RIVER BRIDGE AND WAILUA PLANTATION BRIDGE
1 - 14
GEOTECH REPORT TECHNICAL MEMORANDUM
1 - 37
SECTION 404 PERMIT WAILUA BRIDGE
1 - 11
RIGHT-OF-ENTRY PERMIT TO MITIGATE SAND EROSION AT THE WAILUA BRIDGE (REF. NO. 20KD-036)
1 - 6
RIGHT-OF-ENTRY PERMIT TO USE PORTION OF WAILUA RIVER STATE PARK (LTR. DATED MAR. 17, 2021)
1 - 8
AS-BUILT DRAWINGS
1 - 79
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND IN-WATER POLLUTION PREVENTION PLAN (IWPPP)
1
SWPPP ATTACHMENT A CONTRACTOR/SUB-CONTRACTOR CONTROL MAPS, PROPERTY BOUNDARY MAPS, STATE WATERS AND BMP MAPS, AND BMP DETAILS
1 - 2
SWPPP ATTACHMENT B HDOT SWPPP/IWPPP TRAINING LOG
1 - 2
SWPPP ATTACHMENT C CONSTRUCTION SCHEDULE
1
SWPPP ATTACHMENT D SUBCONTRACTOR CERTIFICATIONS/AGREEMENTS
1 - 7
SWPPP ATTACHMENT E1 DISCHARGE RESPONSE FLOW CHART AND DISCHARGE REPORT
1 - 10
SWPPP ATTACHMENT E2 HDOT SWPPP INSPECTION REPORT FOR KAUAI, MAUI, AND BIG ISLAND LAND-BASED BMPS
1 - 6
SWPPP ATTACHMENT E3 HDOT INSPECTION REPORT FOR IN-WATER WORK
1 - 5
SWPPP ATTACHMENT F SPILL PRVENTION AND RESPONSE PROCEDURES
1 - 7
SWPPP ATTACHMENT G WASTE MANAGEMENT PROCEDURES
1 - 2
SWPPP ATTACHMENT H CONTINGENCY PLAN
1
SWPPP ATTACHMENT I EMERGENCY RELATED PROJECTS, DEPARTURES FROM MANUFACTURERS SPECS FOR FERTILIZERS CONTAINING NITROGEN OR PHOSPHORUS, BUFFER DOC, DOC OF COMPLIANCE WITH UIC REQUIREMENTS, OTHER STATE/FEDERAL/COUNTY PERMITS, AND OTHER INFO. AS REQUESTED BY THE DIR
1 - 3
SWPPP ATTACHMENT J CORRECTIVE ACTION REPORTS
1
SWPPP ATTACHMENT K MONTHLY COMPLIANCE REPORT
1
SWPPP ATTACHMENT L POST-AUTHORIZATION ADDITIONS TO THE SWPPP/IWPPP (INCLUDING ARMY CORPS PCN AND SPECIAL CONDITIONS)
1
SWPPP ATTACHMENT M SWPPP/IWPPP AMENDMENT LOG