SPECIFICATIONS

 

PART I – GENERAL PROVISIONS (DATED 2016)

                  (Not physically included in the Bid Documents)

 

PART II – TECHNICAL PROVISIONS

 

DIVISION 100 – GENERAL PROVISIONS

Section

Description

Pages

Article X

Project Description

10-1 – 10-29

Article XI

Mobilization and Demobilization

11-1

Article XII

Environmental Protection

12-1 – 12-8

Article XIII

Demolition and Removal Work

13-1 – 13-4

Article XIV

Trench Excavation and Backfill

14-1 – 14-2

Article XV

Structural Excavation and Backfill

15-1 – 15-2

Article XVI

Required Submittals

16-1 – 16-3

Article XVII

Portland Cement Concrete Pavement

17-1 – 17-23

Article XVIII

Asphalt Concrete Pavement

18-1

Article XIX

Aggregate Base Course

19-1 – 19-2

Article XX

Hot Mix Asphalt Concrete Base Course

20-1

Article XXI

Water System

21-1 – 21-9

Attachment

Cured-In-Place Pile (CIPP) Rehabilitation of Pressurized Potable Water Pipelines, 4 In. (100 mm) and Larger

1 - 23

Article XXII

Traffic Control

22-1

Article XXIII

Reinforced Concrete

23-1 – 23-4

Article XXIV

Prime Coat

24-1

Article XXV

Tack Coat

25-1

Article XXVI

Temporary Water Pollution, Dust, and Erosion Control

26-1 – 26-15