DANIEL K. INOUYE HIGHWAY

Mauna Kea Maintenance Baseyard

Project No. 200A-01-10

Archive – 0200-1002-D1C1

 

 

(FOR INFORMATION ONLY – PROJECT NOT ADVERTISED)

INDEX TO DRAWINGS

SHEET NO.

DWG. NO.

DESCRIPTION

1

T - 1

TITLE SHEET, LOCATION PLAN

2

T - 2

INDEX TO DRAWINGS

3

T - 3

MOUNTING HEIGHTS

 

 

 

 

CIVIL

4

C - 1

LEGEND, ABBREVIATIONS, INDEX TO CIVIL DRAWINGS

5

C - 2

GENERAL NOTES

6 - 8

C – 3 –

C - 5

WATER POLLUTION & EROSION CONTROL NOTES

9

C - 6

BEST MANAGEMENT PRACTICES AND GRADING NOTES

10

C - 7

WATER NOTES

11

C - 8

GENERAL PLAN

12

C - 9

EROSION CONTROL PLAN

13

C - 10

TYPICAL SECTIONS

14

C - 11

FUEL TANK ELEVATIONS, GENERAL NOTES

15

C - 12

SITE PLAN

16

C - 13

UTILITY PLAN

17

C - 14

GRADING AND DRAINAGE PLAN

18

C - 15

CABIN PLAN

19 - 21

C – 16-

C - 18

PLAN AND PROFILE ACCESS ROAD

22 - 23

C – 19-

C - 20

DETAILS

*24

C - 21

CROSS SECTIONS

 

 

 

 

ARCHITECTURAL

25

AA1.0

ARCHITECTURAL SITE PLAN

26

AA1.1

SHOP BUILDING:  FLOOR PLAN

27

AA1.2

SHOP BUILDING:  MEZZANINE STORAGE

28

AA1.3

SHOP BUILDING:  ROOF PLAN

29

AA2.1

SHOP BUILDING:  EXTERIOR ELEVATIONS

30

AA2.2

SHOP BUILDING:  CROSS SECTION, EXTERIOR ELEVATIONS

 

 

 

31

AB1.1

FUELING STATION:  FLOOR PLAN, PUMP PLAN, FUEL PUMP CROSS SECTION

32

AB2.1

FUELING TANK CROSS SECTION, FUEL PUMP ELEVATION, FUEL TANK ELEVATIONS, GENERAL NOTES

 

 

 

33

AC.1.1

AGGREGATE STORAGE BIN FLOOR PLAN, CROSS SECTION, EQUIPMENT WASH DOWN FACILITY FLOOR PLAN

 

 

 

34

AD1.1

FLAMMABLE STORAGE  BUILDING:  FLOOR PLAN, SECTION, ELEVATIONS, AND DETAILS

 

 

 

35

AE1.1

RENTAL CABIN:  FLOOR PLAN, REFLECTED CEILING PLAN

36

AE2.1

RENTAL CABIN:  EXTERIOR ELEVATIONS

37

AE3.1

RENTAL CABIN:   CROSS SECTION, LONGITUDINAL SECTION, AND DETAILS

 

 

 

 

STRUCTURAL

38

SA1.1

SHOP BUILDING:  1ST FLOOR FOUNDATION PLAN

39

SA1.2

SHOP BUILDING:  MEZZANINE STORAGE FRAMING PLAN

40

SA1.3

SHOP BUILDING:  ROOF FRAMING PLAN

 

 

 

41

SB1.1

FUELING STATION:  GAS TANK GROUND LEVEL FOUNDATION PLAN

*42

SB1.2

FUELING STATION:  PUMPS GROUND LEVEL FOUNDATION PLAN

 

 

 

43

SC1.1

DETAIL PLANS:  AGGREGATE STORAGE BIN FOUNDATION PLAN, EQUIPMENT WASHDOWN FACILITY – SLAB PLAN, FLAMMABLE STORAGE – FOUNDATION PLAN, FLAMMABLE STORAGE – ROOF PLAN

 

 

 

44

SE1.1

RENTAL CABIN:  1ST FLOOR FOUNDATION PLAN, ROOF PLAN

 

 

 

 

MECHANICAL

45

MO.0

LEGEND AND NOTES

46

MO.1

SITE PLAN

 

 

 

47 - 48

MA1.1-MA1.2

SHOP BUILDING:  PARTIAL PLUMBING PLAN

 

 

 

49 - 50

MA2.1-MA2.2

SHOP BUILDING:  PARTIAL ACV PLAN

 

 

 

51

MB1.1

FUELING STATION:  PLUMBING PLAN

 

 

 

52

ME1.1

RENTAL CABIN:  PLUMBING PLAN

 

 

 

 

ELECTRICAL

53

E – 1

SYMBOLS, ABBREVIATIONS, GENERAL NOTES

54

E - 2

SITE PLAN

55

E - 3

SHOP BUILDING:  POWER AND SIGNAL PLAN

56

E - 4

SHOP BUILDING:  LIGHTING PLAN

57

E - 5

FUELING STATION:  POWER AND SIGNAL PLAN

58

E - 6

FUELING STATION:  LIGHTING PLAN

59

E - 7

CABIN:  POWER AND SIGNAL PLAN

60

E - 8

CABIN:  LIGHTING PLAN

 

                        *Sheets Missing (not included)