SADDLE ROAD IMPROVEMENTS

Defense Access Road, PTA-1 Section – Phase 5

Project No. HI A-AD 6(5)

Archive – 0200-1001-D1C8

 

INDEX TO DRAWINGS

SHEET NO.

DESCRIPTION

A1

TITLE SHEET

A2 – A3

PLAN ABBREVIATIONS & SYMBOLS

A4

SURVEY CONTROL INFORMATION SHEET

A5

OVERALL SITE PLAN

A6 – A13

TYPICAL SECTIONS

A14 – A16

SUPERELEVATION DIAGRAMS

B1 – B4

SUMMARY OF QUANTITIES

B5

GRADING SUMMARIES

B6 – B8

SURFACING SUMMARY

B9 – B11

PERMANENT SIGN SUMMARY

B12 – B13

PAVEMENT MARKERS AND STRIPING SUMMARY

B14 – B16

MISCELLANEOUS SUMMARIES

*C1 – C28

ROADWAY PLAN AND PROFILE SHEETS

**D1 – D2

SPECIAL 20403 – APPROACH ROAD CONNECTIONS

D3 – D7

APPROACH ROAD PLAN, PROFILE, & CROSS SECTIONS

E1 – E14

EROSION CONTROL PLAN

E15 – E16

100 PAY ITEM DETAILS – EROSION CONTROL

F1 – F3

200 PAY ITEM DETAILS – OBLITERATION, RIPRAP, & ROCKERY

H1 – H3

QUARRY DETAILS

J1

PAVEMENT TRANSITION DETAILS

M1

CONCRETE PEDESTRIAN PAD DETAILS

N1 – N8

602 PAY ITEMS DETAILS – CULVERTS

N9 – N14

GUARDRAIL DETAILS

N15 – N17

FIREBREAK FENCE AND GATE DETAILS

N18 - N19

MONUMENT DETAILS

P1 – P22

630 PAY ITEM DETAILS – PERMANENT TRAFFIC CONTROL

P23 – P36

SIGNING AND STRIPING PLAN

Q1 – Q11

635 PAY ITEM DETAILS – TEMPORARY TRAFFIC CONTROL

Q12

TEMPORARY TRAFFIC CONTROL PLAN

X1 – X29

CROSS SECTIONS

Z1

CULVERT CROSS SECTION

 

                                *Missing Sheets C5 to C28

                                **Plans not included (D1 thru Z1)