SADDLE ROAD

PTA-1 Section – Phase 3

East Alignment – Phase 1

Project No. HI A-AD/STP 6(3) & 200(1) [HDOT HI 200(7)]

Archive – 0200-1001-D1C5

 

INDEX TO DRAWINGS

SHEET NO.

DESCRIPTION

A1

TITLE SHEET

A2 – A3

PLAN ABBREVIATIONS & SYMBOLS

A4

SURVEY CONTROL INFORMATION SHEET

B1

OVERALL SITE PLAN

B2 – B8

TYPICAL SECTIONS & ROADWAY DETAILS

B9 – B18

SUPERELEVATION DIAGRAMS

C1 – C3

SUMMARY OF QUANTITIES

C4 – C10

GRADING SUMMARY, MASS HAUL DIAGRAM & GRADING DETAILS

C11 – C13

SURFACING SUMMARY

C14 – C19

PERMANENT SIGN & STRIPING SUMMARY

C20 – C23

MISCELLANEOUS SUMMARIES

D1 – D60

ROADWAY PLANS AND PROFILES

E1 – E2

SPECIAL 20403 – APPROACH ROAD CONNECTIONS

E3 – E25

APPROACH ROAD PLAN, PROFILE, & CROSS SECTIONS

F1 – F40

EROSION CONTROL PLANS

F41 – F43

100 PAY ITEM DETAILS – EROSION CONTROL

G1 – G2

200 PAY ITEM DETAILS – EMBANKMENT & OBLITERATION

H1 – H3

QUARRY DETAILS

J1 – J2

400 PAY ITEM DETAILS – PAVEMENT TRANSITIONS & RUMBLE STRIP

L1 – L5

LONGITUDINAL CULVERT SECTIONS AND PLAN DETAILS

L6 – L13

600 PAY ITEM DETAILS – DRAINAGE STRUCTURES

L14

RUBBLE MASONRY & MORTARED RIPRAP DETAILS

L15

PLACED RIPRAP DETAILS

L16

CATCH BASIN DETAILS

M1 – M5

610 PAY ITEM DETAILS – ROADSIDE STRUCTURES

N1 – N2

620 PAY ITEM DETAIL – MONUMENT

P1 – P39

SIGNING & STRIPING PLAN

(STA. T.S. 0+00 – t.s. 10+00 & 360+00 – 1165+00)

P40 – P61

630 PAY ITEM DETAILS – PERMANENT TRAFFIC CONTROL

Q1 – Q13

630 PAY ITEM DETAILS – TEMPORARY TRAFFIC CONTROL

Q14 – Q24

TRAFFIC CONTROL PLAN

R1

CONCRETE PEDESTRIAN PAD DETAILS

*X1 – X326

ROADWAY CROSS SECTIONS

 

                        *Missing – Not Included