HAWAII BELT ROAD

Hakalau Stream Bridge Rehabilitation

Bent 8 Scour Repair

Federal-Aid Project No. BR-019-2(082)

Archive – 0019-1106-PE2C1

 

PERMITS, REPORTS AND OTHER ENVIRONMENTAL DOCUMENTS

SECTION

DESCRIPTION

1

PROJECT-SPECIFIC CONSTRUCTION EHMP (C-EHMP) FOR HAKALAU STREAM BRIDGE SCOUR REPAIRS_COVER

1

SIGNATURE PAGE

1 - 2

TABLE OF CONTENTS

1

ACRONYMS

1 - 22

PROJECT-SPECIFIC CONSTRUCTION ENVIRONMENTAL HAZARD MANAGEMENT PLAN (C-EHMP) DOCUMENTS

1

FIGURES_COVER

1

FIGURE 1 – REGIONAL AND SITE LOCATION MAP

1

FIGURE 2 – AREAS OF CONTAMINATION

1

FIGURE 3 – SITE MAP

1

FIGURE 4 – HAZARD MAP

1

APPENDIX A – EROSION AND SEDIMENT CONTROL PLAN_COVER

1 - 3

EROSION CONTROL NOTES-PLAN

1

EROSION CONTROL DETAILS

1

EROSION CONTROL PLAN

1

APPENDIX B – EXAMPLE SOIL ACCEPTANCE AGREEMENT

1 - 2

SOILS ACCEPTANCE AGREEMENT

 

 

1 - 147

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND IN-WATER POLLUTION PREVENTION PLAN (IWPPP) FOR:  HBR, HAKALAU STREAM BRIDGE REHABILITATION, BENT 8 SCOUR REPAIR, FAP NO. BR-019-2(082)_DA FILE NO. POH-2022-00091 – (EDITABLE.DOC)

 

 

1 - 7

APPENDIX A, HBR, HAKALAU STREAM BRIDGE REHAB., BENT 8 SCOUR REPAIR

1 - 41

PROJECT-SPECIFIC CONSTRUCTION EHMP (C-EHMP) FOR HAKALAU STREAM BRIDGE SCOUR REPAIRS LOCATED AT HAKALAU STREAM BRIDGE (ROUTE 19) TMK (3) 3-1-001:999

1 - 3

FIGURE X AND HDOT HIGHWAYS OAHU CONSTRUCTION CONTINGENCY PLAN

 

 

1 - 3

NATIONWIDE PERMIT VERIFICATION FOR HDOT, HAKALAU BRIDGE REHABILITATION, DEPARTMENT OF THE ARMY FILE NO. POH-2022-00091_LTR. DATED JULY 14, 2023