Island Plans Route Begin MP End MP Bid Open Date Project No. Project Type
Oahu Contract Plans
Special Provisions
Bid Tabulations
00H3 8.75 8.75 2004-10-28 CMAQ-0300(100) ADA COMPLIANCE
Kauai  Contract Plans
0560 8.84 8.76 1970-07-16 56D-02-70 RESURFACING  
Oahu  Contract Plans
00H1 8.17 8.76 1973-06-07 I-H1-1(46):8 ORIGINAL  
Oahu Contract Plans
Special Provisions
Bid Tabulations
0093 8.77 8.77 2005-06-23 CMAQ-0300(101) TRAFFIC SIGNAL OTHERS  
Oahu Contract Plans
00H1 8.75 8.77 1998-06-04 BR-H1-1(227) STRUCTURES  
Oahu Contract Plans
Special Provisions
00H1 8.75 8.77 2009-06-30 HWY-O-04-09M SLOPE PROTECTION EROSION CONTROL  
Oahu Contract Plans
Special Provisions
Bid Tabulations
00H1 8.75 8.77 2010-06-24 HWY-O-04-10M EROSION CONTROL SLOPE PROTECTION  
Oahu  Contract Plans
00H1 8.078 8.778 1973-10-11 I-H1-1(97):8 LANDSCAPING SPRINKLER  
Oahu  Contract Plans
Bid Tabulations
0061 8.75 8.779 1960-08-04 TA-0001-05-60 GUARDRAIL  
Hawaii  Contract Plans
0250 8.66 8.79 1994-06-29 HWY-H-06-94 GUARDRAIL SHOULDER IMPROVEMENT  
Maui Contract Plans
Special Provisions
Bid Tabulations
0037 13.95 8.79 2011-11-10 STP-037-1(025) PAVEMENT PREVENTIVE MAINTENANCE
Oahu  Contract Plans
0099 6.55 8.799 1944-07-19 DA-WR 7(1) ORIGINAL  
Oahu  Contract Plans
0092 8.64 8.8 1968-01-01 JOB NO. 35-68R STRUCTURES  
Kauai Contract Plans
0560 8.7 8.8 ER-19(001) EMERGENCY REPAIRS
Oahu Contract Plans
Special Provisions
Bid Tabulations
00H1 8.77 8.81 2022-06-20 HWY-O-02-20 OTHERS BEST MANAGEMENT PRACTICES
PAGE 333 OF 558