Island Plans Route Begin MP End MP Bid Open Date Project No. Project Type
Contract Plans
Bid Tabulations
0092 0.48 1.0 1974-05-23 I-H1-1(73):15
Contract Plans
0092 0.54 0.56 1977-08-11 I-H1-1(143):15
0092 0.73 1.04 1944-01-01 FAGH 9-A(11) [Z]
0092 0.8 0.84 1950-07-20 F-9(34) 3RD UNIT [Z]
Contract Plans
0092 0.82 0.93 1960-01-01 A-0092-01-60 [Z]
Contract Plans
0092 0.82 2.9 1945-09-04 SN-FAP 9-A(13) [Z]
0092 0.82 2.69 1936-01-01 NRH 9A REOPENED [Z]
Contract Plans
0092 0.82 2.85 1960-06-09 A-0001-04-60
Contract Plans
0092 0.82 4.12 1948-01-01 F-9(36) [Z]
Contract Plans
0092 0.82 3.61 1964-01-16 D-90-01-64 [Z]
Contract Plans
0092 0.82 3.6 1943-01-01 9D(5) (JOB NO. 5131) [Z]
Contract Plans
0092 0.82 3.6 1943-01-01 9A(10) (JOB NO. 5131) [Z]
Contract Plans
0092 0.82 3.06 1943-01-01 DA-NR-10A(1) [Z]
Contract Plans
0092 0.82 2.69 1941-01-01 SN-FAP 9-A(6) [Z]*
Contract Plans
0092 0.82 2.69 1933-01-01 NRH 9A [Z]
PAGE 28 OF 558