Island Plans Route Begin MP End MP Bid Open Date Project No. Project Type
Contract Plans
Bid Tabulations
0092 3.46 3.69 1948-09-08 F9(34) [Z]
Contract Plans
0019 7.22 10.97 1947-06-09 FA-F 14B(1)
Contract Plans
0099 18.09 19.0 1946-08-01 FAGCP No. S.G. (20)1
Contract Plans
0019 7.22 9.32 1941-03-03 FAGH 14-B(2) & FAP 14-B(1)
Contract Plans
0019 35.5 36.06 1938-01-01 FAGH 26A
Contract Plans
0930 6.161 6.689 1940-01-12 FAGH 35-B(1)
Contract Plans
7101 0.92 1.15 1938-06-09 FAGH 4-C
Contract Plans
7101 1.18 1.49 1938-06-09 FAGH 4-C
Contract Plans
7101 2.81 2.24 1938-06-09 FAGH 4-C
0092 0.73 1.04 1944-01-01 FAGH 9-A(11) [Z]
0092 1.3 1.38 1944-01-01 FAGH 9-A(12) [Z]
0092 2.81 2.88 1944-01-01 FAGH 9-D(5) [Z]
Contract Plans
FAGH 9D
Contract Plans
0083 21.7 31.0 1925-01-01 FAP 1
Contract Plans
0019 9.32 10.97 1941-03-03 FAP 14-B(1) & FAGH 14-B(2)
PAGE 234 OF 558