Island Plans Route Begin MP End MP Bid Open Date Project No. Project Type
Contract Plans
032A 0.0 0.388 1991-06-20 HWY-M-01-91M
Contract Plans
032A 0.223 0.012 1955-01-01 DA-NC 8(1) [JOB NO. 5769]
Contract Plans
032A 0.0 0.4 2005-01-01 HWY-M-01-05M
Contract Plans
032A 0.0 0.41 2005-06-23 HWY-M-01-05M
Contract Plans
032A 0.0 0.11 2005-01-01 HWY-M-01-05M
Special Provisions
Bid Tabulations
032A 0.0 0.393 2017-06-01 HWY-MM-01-17M
Contract Plans
Special Provisions
Bid Tabulations
032A 0.0 0.39 2017-06-16 HWY-M-02-17
Special Provisions
Bid Tabulations
032A 0.0 0.393 2018-08-02 HSIP-0900(096)
Special Provisions
Bid Tabulations
032A 0.0 0.393 2018-08-30 STP-0900(097)
Special Provisions
Bid Tabulations
032A 0.0 0.393 2020-09-08 STP-0900(094)
Special Provisions
Bid Tabulations
032A 0.0 0.393 2023-02-16 HSIP-0900(105)
Special Provisions
032A 0.0 0.393 2023-10-18 STP-0900(107)
Special Provisions
Bid Tabulations
0311 0.0 6.405 2017-06-01 HWY-MM-01-17M
Contract Plans
Special Provisions
Bid Tabulations
0311 0.88 1.01 2017-06-16 311A-01-17
Contract Plans
Special Provisions
Bid Tabulations
0311 0.0 6.41 2017-06-16 HWY-M-02-17
PAGE 157 OF 558